Jump to content

Translations:Powertrain Overheating/3/zh-hant: Difference between revisions

From Derail Valley
Importing existing translations
 
Nokau (talk | contribs)
No edit summary
 
Line 1: Line 1:
可以透預先認識可能的瓶頸段,在到達前多加監控相應的溫度並以長時間分散負載至傳動系統上以防過熱。
除了確保所牽引{{pll|Rail Vehicle Types|列車}}操作正確並未度超重,在駛近可能的瓶頸{{pll|Railway Terminology|軌道}}落前透過對應儀表監控溫度將動力以長時間分散以防過熱。

Latest revision as of 09:28, 25 April 2025

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Powertrain Overheating)
Apart from ensuring that the {{pll|Rail Vehicle Types|train}} is properly set up and not overly heavy, overheating can be prevented by monitoring respective temperature gauges ahead of the troubling {{pll|Railway Terminology|track}} sections, anticipating them and spreading the load on the powertrain over a longer period of time.

除了確保所牽引列車 操作正確並未過度超重,在駛近可能的瓶頸軌道 段落前,透過對應儀表監控溫度,並將動力以長時間分散以防過熱。