Translations:Shunting/6/en: Difference between revisions
Appearance
Importing a new version from external source |
Importing a new version from external source |
||
Line 1: | Line 1: | ||
When | When a train is at the required cargo transfer track, use the {{pll|Cargo Transfer|cargo transfer machine}} to load or unload cargo. |
Latest revision as of 11:47, 7 March 2025
When a train is at the required cargo transfer track, use the cargo transfer machine to load or unload cargo.